Skip to main content
FRIMONT SA, homeTell us about your project
Process equipment during installation at Dioxitek, Formosa.

Refrigeration and process systems for uranium

Engineering, equipment, and execution for high-complexity projects, focusing on reliability, integration, and scale.

Tell us about your project

Real project · Dioxitek, Formosa.

Understand the process.
Define the solution.

Integrating refrigeration and process systems requires defining responsibilities, coordinating disciplines, and verifying every interface. Frimont's participation in Dioxitek's NPU provides a concrete reference for this approach, from detail engineering to commissioning of the agreed scope.

Applications and requirements

Industrial refrigeration

Engineering and equipment for plant refrigeration utilities, integrated with process requirements.

Evaporation and precipitation

Integration of process equipment and systems. At Dioxitek, collaboration expanded into these areas during project execution.

Phased development

Coordination of new requirements with existing systems and each stakeholder's responsibilities.

Documented experience

Engineering in practice.

Before selecting equipment

Decisions that guide the project

Your operational conditions define the design. These are the key aspects to review from the start.

  • Technical requirements and scope boundaries
  • Interfaces between refrigeration and process
  • Documentation, traceability, and agreed acceptance criteria
  • Testing sequence and commissioning

A clear scope,
from the beginning.

We can handle a single stage or integrate multiple disciplines. Frimont's scope of responsibility and deliverables are defined for each project.

Detail engineering and interface documentation

Integration of equipment under Frimont's responsibility

Erection support and commissioning

Learn about our capabilities

Tell us what you need to solve.

Does your project require coordinating refrigeration and process systems?

To get started, you can share:

  • The process or facility and its location.
  • Current situation and project objective.
  • Existing equipment and available operating data.
  • Current stage and desired scope.

You do not need a complete RFP to start a conversation.

Tell us about your project