Dioxitek / Nuclear industry / industrial processes
Refrigeration and process systems for Dioxitek
Engineering, equipment, and systems integration for the New Uranium Plant (NPU) in Formosa, with a scope that continues to expand alongside project requirements.
Tell us about your project
- Industry
- Nuclear industry / industrial processes
- Location
- Formosa, Argentina
- Development
- Phased development, ongoing collaboration
- Equipment
- 5 ammonia compressors
- 9 evaporative condensers
- 2 air conditioning chillers
- Frimont's Scope
- Detailed engineering, refrigeration, and process integration through commissioning
The project
Dioxitek produces uranium dioxide, a raw material used in manufacturing fuel elements for Argentine nuclear power plants. The New Uranium Plant project in Formosa is part of that industrial supply chain.
Frimont supports its development with refrigeration solutions and process systems. The relationship has expanded into new phases and responsibilities, built on the client's confidence in the engineering and execution team.
The challenge
The initial requirement was to develop the project's industrial refrigeration. As site requirements evolved, Dioxitek expanded Frimont's involvement to the precipitation and evaporation areas, introducing new integration challenges.
The solution
The refrigeration solution comprises five ammonia compressors, nine evaporative condensers, and two air conditioning chillers. The industrial circuit uses ammonia as a natural refrigerant, while the air conditioning system uses R134a.
Frimont's scope spans from detailed engineering to commissioning of the systems under its responsibility. The scope also includes the integration of the evaporation area and associated works in the precipitation area.
Project continuity
Collaboration continues through scope extensions. This project demonstrates Frimont's capability to support different stages of an industrial development and respond to emerging engineering, equipment, and integration requirements.
In pictures
The project up close
From the jobsite
The project on video
Dioxitek - Machine room construction
Watch on YouTube ↗Related solutions
Let's talk about your project
Does your project require integrating refrigeration and industrial processes? Let's discuss your requirements.
Tell us about your project