Skip to main content
FRIMONT SA, homeTell us about your project
Conceptual image of food and beverage, generated with AI.

Refrigeration for food and beverage

A precise thermal system preserves product integrity, stabilizes the process, and supports continuous production.

Tell us about your project

Conceptual image generated with AI. Does not correspond to a Frimont project.

Understand the process.
Define the solution.

Every food product and production stage poses distinct thermal requirements. Design begins with the product, production pace, and the sequence of cooling, cold storage, or freezing to define a solution integrated into operations.

Applications and requirements

Process cooling

Chilled water and secondary circuits to serve the needs of production lines, heat exchangers, and process equipment.

Freezing and cold storage

Evaluation of cold rooms and refrigeration equipment according to the product, packaging, and required production capacity.

Machine rooms and control

Integration of cooling generation, distribution, automation, and technical assistance within the project scope.

Documented experience

Engineering in practice.

Before selecting equipment

Decisions that guide the project

Your operational conditions define the design. These are the key aspects to review from the start.

  • Product, packaging, and production throughput
  • Temperatures required at each stage
  • Operating schedules, seasonality, and projected growth
  • Sanitation, accessibility, and available utilities

A clear scope,
from the beginning.

We can handle a single stage or integrate multiple disciplines. Frimont's scope of responsibility and deliverables are defined for each project.

Thermal balance and solution alternatives

Engineering, selection, and supply of equipment

Erection, commissioning, and support according to scope

Learn about our capabilities

Tell us what you need to solve.

Are you looking to develop a new line or expand the refrigeration capacity of your plant?

To get started, you can share:

  • The process or facility and its location.
  • Current situation and project objective.
  • Existing equipment and available operating data.
  • Current stage and desired scope.

You do not need a complete RFP to start a conversation.

Tell us about your project