Cooling tower retrofit at Alto Rosario

Replacement of four cooling towers for the shopping mall's air conditioning system, including engineering, facility retrofits, and commissioning.

Tell us about your project
Cooling towers and steel structure on the Alto Rosario rooftop
Industry
Shopping centers / HVAC
Location
Rosario, Santa Fe, Argentina
Duration
4 months
Equipment
  • 4 evaporative cooling towers
Frimont's Scope
Conceptual and detailed engineering, dismantling, retrofits, installation, electrical works, and commissioning

The project

Alto Rosario, an IRSA shopping mall located in Rosario, Santa Fe, opened in 2004 on a site that repurposed historic railway structures. Frimont participated in upgrading its cooling infrastructure associated with the air conditioning system.

The challenge

The shopping mall needed to replace an obsolete cooling system. The project required removing existing equipment and retrofitting the facilities to integrate four new evaporative cooling towers.

The solution and implementation

Frimont developed conceptual and detailed engineering and executed the dismantling of previous towers, necessary facility adaptations, and installation of the new units. The scope included associated electrical installations and commissioning.

The project was executed over four months, integrating all tasks required to modernize the system.

Result

The project modernized Alto Rosario's cooling infrastructure with four new evaporative towers, seamlessly integrated into the facility's HVAC system.