Skip to main content
FRIMONT SA, homeTell us about your project
Conceptual image of large buildings and infrastructure, generated with AI.

Thermal systems for large buildings and infrastructure

Centralized HVAC for commercial buildings, hotels, and shopping centers, focusing on reliability, efficiency, and facility integration.

Tell us about your project

Conceptual image generated with AI. Does not correspond to a Frimont project.

Understand the process.
Define the solution.

Centralized HVAC must respond to building occupancy, usage patterns, and existing infrastructure. In retrofit projects, access conditions and compatibility with existing systems are just as critical as selecting new equipment.

Applications and requirements

Cooling system retrofit

Replacement and upgrading of cooling towers and associated air conditioning equipment, with coordinated engineering and erection.

Chilled water plants

Evaluation of chilled water generation and heat exchange to meet large-scale climate control demands.

Integration and commissioning

Coordination of mechanical connections, electrical installations, and performance verification for the modified scope.

Documented experience

Engineering in practice.

Before selecting equipment

Decisions that guide the project

Your operational conditions define the design. These are the key aspects to review from the start.

  • Building use and occupancy profile
  • Condition of existing equipment and piping networks
  • Access routes, mechanical rooms, and erection constraints
  • Construction windows and operational requirements

A clear scope,
from the beginning.

We can handle a single stage or integrate multiple disciplines. Frimont's scope of responsibility and deliverables are defined for each project.

Conceptual and detail engineering

Facility retrofits and equipment erection

Electrical installations and commissioning according to scope

Learn about our capabilities

Equipment and applications

Explore by product.

Options to evaluate based on your process conditions.

Industrial refrigeration: view the overview

Tell us what you need to solve.

Do you need to upgrade the cooling infrastructure of your building?

To get started, you can share:

  • The process or facility and its location.
  • Current situation and project objective.
  • Existing equipment and available operating data.
  • Current stage and desired scope.

You do not need a complete RFP to start a conversation.

Tell us about your project