Cooling towers with a built-in heat exchanger: the process liquid flows through a stainless-steel coil and is cooled without contamination from the air or the basin water.

Also known as shielded or sealed-circuit towers. We build them in FRP and stainless steel, with no galvanized parts.

Two-module FRIMONT TEC closed-circuit tower with FRP casing
TEC closed-circuit tower.

TEC vs. open tower + plate heat exchanger

The most common alternative to a closed tower is an open tower with a plate heat exchanger and a filtration system. It works, but it adds equipment and is delicate: the narrow plate passages foul and scale with tower water, they have to be opened, cleaned and re-gasketed, and the filtration needs its own maintenance.

The TEC does the same job with a single unit and no connections between components. The heavy-wall stainless-steel coil tolerates hard water, accepts chemical and mechanical cleaning and is accessible from the tower itself.

Flanged stainless-steel headers on the side of an FRP TEC tower

Applications

What it solves.

In the TEC, the liquid to be cooled (demineralized water, water with additives, chemicals, oils, juices or musts) flows inside an AISI 304L or 316L stainless-steel coil. Water from the evaporative circuit falls over the coil and the fans' air carries the heat away. The process liquid never touches the air or the basin water, so it picks up no dust, particles or dirt. It is a robust monoblock unit with very low maintenance, designed to work with hard water.

  • Cooling of demineralized water and furnace, mold and reactor circuits.
  • Cooling of chemicals, oils, juices and musts.
  • Condensing for water-cooled chillers in large buildings.
  • Replacing an open tower with a plate heat exchanger.

Configurations

A configuration tailored to your application.

Technical selection defines the equipment and its integration with the process.

With its own basin

Complete tower with FRP basin, recirculation pump and a large removable filter that can be cleaned with the unit running.

Without basin

Towers mounted on a concrete basin. The basin is designed to limit stored water and the load on the structure.

CONEV for wineries

Version for wine fermentation control, with two or three circuits to cool several musts at once.

Technical data

Reference values.

TEC vs. open tower with plate heat exchanger

Open tower + plate heat exchanger + filtrationTEC closed-circuit tower
Equipment to maintainTower, heat exchanger, filter and pumps for both circuitsA single monoblock unit
Weak pointNarrow plate passages that foul and scale; opening, cleaning and re-gasketingHeavy-wall stainless coil, accessible and cleanable from the tower
FiltrationEssential to protect the plates, with its own maintenanceRemovable filter in the basin, cleaned while running
If the tower water gets dirtyHeat exchanger performance drops and pressure drop risesOnly affects the outside of the coil, which can be washed
ConnectionsPiping, valves and pumps between unitsNo connections between components

Qualitative comparison. With very large flows or when the tower already exists, it is worth calculating both alternatives.

Selection

How we define the solution for your process.

We start from what you need to achieve and your facility conditions. We guide you through defining requirements and selecting an appropriate configuration. You do not need to have all this data to start the conversation.

What we evaluate during technical definition
Liquid and flow
Which liquid is cooled, how much flows and what pressure drop the circuit allows.
Temperatures and climate
Inlet and outlet temperatures, location, altitude and design wet bulb.
Water, space and installation
Make-up water quality, available space and maximum weight per piece for lifting.

FAQ

What clients usually ask us

TEC or open tower with a plate heat exchanger?

If the liquid must stay clean and the local water is hard or dusty, the TEC avoids the plate heat exchanger and its filtration, the most delicate and maintenance-heavy parts of that solution. An open tower with a heat exchanger may make sense with very large flows or when the tower already exists; in that case we calculate both alternatives.

How does it differ from a TEV tower?

In the open-circuit TEV, the water to be cooled falls over the fill in contact with the air. In the TEC the liquid flows inside a coil and is never exposed to the air or the basin water.

What materials is it made of?

FRP casing and basin; AISI 304L or 316L stainless-steel coil and headers; stainless-steel structure, supports and bolts. It has no galvanized parts to rust.

Documentation

Technical documentation.

Browse reference brochures for each series. To select equipment, request the configuration and specifications for your project.

Request technical documentation

Engineering and integration

Scope is defined with you.

From equipment selection to integration, installation, and commissioning, we agree on what the project needs and how it connects to your facility. Control systems and after-sales service are integral parts of that conversation.

What we can undertake
Chat on WhatsApp